Son Steve and I are putting up a steel workshop building dedicated to LEDgreenie™ Pro and other LED construction projects at Steve's place in Port St John, This should take place within 4 weeks. The workshop needs both 115 & 220 Volt service - the latter for AC usage. Need wall outlets for work tables and overhead fluoro lights.
The buiding is new assembly, on site, with a new concrete pad, about 18' x 30'.
Contact Steve at 321 dash 537 dash 8202.
Pete (NiteOwl40) at 321 dash 506 dash 7948 for details.
The buiding is new assembly, on site, with a new concrete pad, about 18' x 30'.
Contact Steve at 321 dash 537 dash 8202.
Pete (NiteOwl40) at 321 dash 506 dash 7948 for details.









